UMaTSpace

Cost reduction through mine to mill optimisation – a case study at Newmont Akyem Mine

Show simple item record

dc.contributor.author Kugbe, Kekeli Kojo
dc.date.accessioned 2022-08-18T11:44:54Z
dc.date.available 2022-08-18T11:44:54Z
dc.date.issued 2019-05
dc.identifier.citation Kugbe, K. K. (2019) Cost Reduction through Mine to Mill Optimisation – A Case Study at Newmont Akyem Mine. MSc. Thesis. University of Mines and Technology. en_US
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/369
dc.description viii, 72p. ill. en_US
dc.description.abstract Recent economic factors have negatively influenced the mining operations of the Newmont Akyem Mine of Newmont Golden Ridge Limited, leading to major concerns on sustainability and profitability. In an operating mine, the main cost driver in the operating cost is influenced mainly by the cost of mining and processing. The size reduction processes from the mine until the mineral is liberated contribute immensely to these cost levels. Effective ways of reducing mining and processing cost significantly while delivering desired results in fragmentation for shovel loading, hauling and milling purposes was the focus of this research. The cost reduction technique used in this research was testing of the cost implication of seven blast scenarios by varying the drill and blast parameters and the use of a more potent explosive and also comparing their effect downstream on crusher energy use (electrical power). In addition to the existing blast pattern 4 m × 4 m at Akyem, additional six pattern scenarios were considered and tested. Patterns 3 m × 3 m, 3 m × 3.5 m, 3.5 m × 3.5 m, 3.5 m × 4 m, 4 m × 4 m, 4 m × 4.5 m and 4.5 m × 4.5 m under similar geological conditions at Akyem main pit resulted in a drill and blast cost savings ranging from $ 0.50/tonne to $ 0.22/tonne and crushing energy cost savings ranging from $ 2.14/tonne to $ 4.05/tonne. All simulated patterns produced good fragmentation with the ground vibration and air over pressure levels within acceptable limits. Using pattern 4 m × 4 m costs as baseline representing budget cost, the current pattern size 4.5 m × 4.5 m results in total crushing and drilling and blasting cost percentage variance of -8% implying a loss. However, pattern 3 m x 3 m resulted in +40% variance implying a gain and therefore was found to be the most cost effective. en_US
dc.language.iso en en_US
dc.publisher University of Mines and Technology en_US
dc.subject Economic issues en_US
dc.subject Mining operations en_US
dc.subject Cost reduction en_US
dc.title Cost reduction through mine to mill optimisation – a case study at Newmont Akyem Mine en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search UMaTSpace


Advanced Search

Browse

My Account